I managed to make a little more headway on both the walls of the
briquetting plant and the mineral house house for my copper smelter
module this weekend.
|
There
are now three completed walls for the briquetting plant. The strange
"peaked blob" at the upper end of the end wall on the right is the
mounting for an enclosed overhead way which will connect to the adjacent
limestone house. |
|
Front 3/4 view of the mineral house. |
|
Rear
3/4 view of the mineral house. The vertical red sheathed structure is
the housing for a bucket conveyor which brought crushed ore up into the
bins. This structure will be located tight against a 30" spur. Hoppers
will discharge ore into a pit beneath the rails which will then be
picked up by the conveyor. |
|
Close-up
of the front of the mineral building showing the chutes down which the
crushed ore was loaded into 18" gauge manually pushed cars for transport
to the furnace. |